Trenchless Process
Our 5-Step Trenchless Process
1
Video Inspection
We camera-inspect the full line to confirm damage and measure the repair length.
2
Planning & Permits
We map access points, verify utility clearances, and obtain all required permits.
3
Preparation
Pull points are set, equipment staged, and the path cleared.
4
Pipe Replacement
The pipe bursting pull installs the new HDPE pipe in a single pass.
5
Connect & Test
Pipes reconnected, flow tested, system verified — clean and efficient.

